Year
2019
Location
Watermael-Boitsfort
Architect
GNS Architects
Contractor
bLIVE - Mr Pilette and Stella
Budget
530000 €

684 – Construction of a block of flats in Watermael-Boitsfort

When construction optimises volume to enhance space

This new-build project involves a modern building, situated on a street corner, comprising two flats. 

Its design is characterised by optimised spatial layout, with every detail carefully considered to maximise the use of the available space. This approach is illustrated by the incorporation of a floor slab and particularly slender columns into the building’s structure.

With this in mind, every centimetre has been meticulously saved and exploited, in order to meet functional requirements while blending harmoniously into the existing urban environment.

Let's talk about your projects.

Do you have a request or a question? Our team is here to share all its knowledge and help you create your projects.