What rises above rests on what lies below
Located in the heart of the city, this project stands out for the scale of its earthworks, carried out in a particularly constrained environment.
The construction included two levels of underground car parks located in direct contact with existing buildings, which required rigorous control of the excavation phases due to the considerable depth of the excavation. The work was carried out in a limited space, where each stage had to be orchestrated with precision in order to preserve the stability of the neighbouring buildings.
This project, for a medium-sized flat block, demonstrates our expertise in managing complex projects in urban environments, where technical challenges and spatial constraints meet.
Do you have a request or a question? Our team is here to share all its knowledge and help you create your projects.